SEMS® has a production scheduler by work center that the Production Planner can manually adjust daily, the production orders, to meet their needs/demands of orders at each work center.
- Scheduler for production work center sequencing, loading schedules, set up, provisioning-processing at each work center reviewing thru-put capacities, purchasing-sales order, quote demands against a promise date for processing/delivery, CTP/ATP, Capability and Availability To Promise shipments on a specific date.
- Monitor and compare all aspects of the business operation to find “best practices”
- Gain flexibility and increase work center production throughput by scheduling work to work centers across multiple departments and locations
- Automatic linking and data transfer of work in progress from a completed work step specified as input to the next step
- No paper handling required. All details available by scanning bar codes or on RF handheld devices. Work is distributed through the plant with no paper work required.
- Freely integrate Outside Processing operations with the same control and reporting as internal processing operations, providing greater production capacity flexibility
- Monitor actual profit margin through production processes based on real waste and production loss and specific input materials used for each order line item
- Ensure that the right inventory is used in the production process
- Reduce claims by using a fully specified process with customer-specific tolerances with order line details based on one-time data entry to reduce entry errors.
- Advanced EDI integration for inter-plant or inter-company data transfer to reduce or eliminate paperwork
- Completely integrated production calendar for shift planning and up-time allocation.
- Added versatility and profitability from using the Fabrication capability to add additional value and provide more service to your customer
- Increased income from scrap sales which are managed and invoiced in an integrated process.
- Supports a wide range of standard steel processes including slitting, cut to length, shearing, galvanizing, pickling, straightening, burning and pipe and tube manufacturing.
- Handles shape transformation
- Manages bundle break operations. Bundle break elements can be allocated to production orders in virtual form prior to physical bundle break, once the bundle break occurs; the actual new tag is substituted automatically.
- Input materials can be customer-owned for toll processing
- Provides a detailed sequence of steel making and finishing processes customized specifically for the order line requirement
- Designed for the rigors and realities of shop floor operations under harsh conditions
- Most input is scanned and start and stop timing is then automatic, for accurate real cost allocations
- Work orders are automatically generated from Sales Order Work Instructions.
- Work orders are grouped to production orders automatically, with similar work from other Sales Orders
- Work order provisioning is highly automated to minimize potential errors, it is also carefully validated to ensure compatibility with predecessor steps
- Transfer steps between production work centers in different locations are generated automatically
- Multi-time zone facilities can be managed with one integrated system with location-sensitive time and date display
- Packaging processes managed as a separate production process with extra flexibilities
- Tags can be partially allocated to a number of different orders
- Physical tag allocation automatically substitutes for general allocation by ICI or “dummy” tag
- Production orders are automatically assigned to the default work center and can be quickly re-allocated to another similar work center during the scheduling process to balance loading
- Shift calendar is driven from a master calendar with amendment available at each level – Company, Department/Division, Warehouse, Work center
- Add production steps to a work order even after it has been sent to production. (Cancel production, amend, re-provision).
- Add new work centers or add extra shifts to a work center to create greater capacity in bottle-neck areas
- One shift calendar with local variations and time shift by time zone
<191>