| Priority |
P1 |
P2 |
P3 |
P4 |
P5 |
| Severity | Production | Production | Customer Testing | Our testing | In development |
| Blocker | A1 Drop everything Production stopped no work around |
A3 Urgent Production stopped no work around |
B1 Urgent Customer testing stopped no work around |
C1 Urgent Our testing stopped no work around |
D1 Urgent development stopped no work around |
| Critical | A2 Drop everything Production stopped no work around |
A4 Urgent Production stopped no work around |
B2 Urgent Customer Testing stopped no work around |
C2 Urgent Our Testing stopped no work around |
D2 Urgent development stopped no work around |
| Major | A7 Highly Significant problem production severely limited |
A8 Significant problem production limited |
B4 Significant problem Customer testing limited |
C4 Significant problem our testing limited |
D4 Significant problem our development limited |
| Normal | A9 Normal problem, most production continues |
A10 Less significant production problem |
B5 Normal testing |
C5 Normal testing |
D5 Normal development |
| Minor | A11 Small problem that needs attention. |
A12 Small problem less significant |
B6 Small problem that needs attention. |
C6 Minor test |
D6 Minor development |
| Trivial | A13 An irritating problem that should be fixed now |
D2 Probably fixed as part of a release, not now |
B7 Probably fixed as part of a release, not now |
C7 Probably fixed as part of a release, not now |
D7 Get trivial problems fixed |
| Enhancement | A5 An enhancement (Not closed)that has been moved to production and has a significant problem in live usage |
A6 An enhancement (not Closed) that has been moved to production and has a problem in live usage |
B3 An enhancement has a problem in customer testing. |
C3 An enhancement has a problem in our testing |
D3 An enhancement is being developed |